Today
Senior Electrical Engineer (Onshore Facilities)
Brunel International
Qatar, Doha
Other High-Paying Jobs in Doha
```htmlJob DescriptionWhat are you going to do:Provides pre-commissioning and commissioning planning, coordination, and execution leadership to the project management team, with close coordination with the heads of pre-commissioning and commissioning and systems owners. Ensure close coordination and supervision of the pre-commissioning and commissioning activities by the Desalination plant Contractor, including sharing weekly coordination meetings and in charge of the review and approval of the related minutes of meeting and actions list.Provide close coordination with the Handover and Completion Division Manager and his team, as well as with the Business Division Manager to provide clear and comprehensive weekly and monthly reporting, associated skylines, and dashboards to the PMT leadership team, that is also aligned with Desalination plant Contractor.Focal point to Business/procurement team for all aspects related to Vendors mobilization (by Contractor) for pre-commissioning, commissioning, and pre-start-up activities. Review the three (3) months look-ahead plan with Contractor. Participate in the review and comment of the pre-commissioning and commissioning deliverables issued by Contractor and its Subcontractors.Participate in all Quality Flawless Execution, Uninterrupted Start-Up (UISU), SIMOPS meetings either internally to PMT leadership team, with LNG OES, and with Contractor: review minutes of meeting and follow-up on actions. At the initial stage upon mobilization and given the scope and size of the facilities to be commissioned, provide pre-commissioning and commissioning management, leadership, and execution supervision for the desalination plant / remineralization unit.Focal point to LNG OES for all aspects, including documentation related to the Operation Readiness Plan (ORP) and Interim Operations. Monitors pre-commissioning and commissioning execution performances through Key Performance Indicators, metrics, and exception reports to be either prepared by Desalination plant Contractor or CTJV or within the team.Supports resolution through coordination with the respective Pre-commissioning and Commissioning Division Manager and functional managers to identify mitigation options and contingency plans. Work closely with Contractor, CTJV, Desalination plant contractor, Quality, IM, handover, and completion division managers to promote and develop a “paperless approach” for all activities related to pre-commissioning and commissioning.Essential Skills and KnowledgeBachelor’s degree in electrical engineering or equivalent.Minimum of 8 years’ experience of Electrical Engineering, preferably in a major LNG Projects.Broad knowledge of engineering execution including design standards, specifications, codes, safety criteria Onshore LNG facilities design, commissioning, and operations would be advantageous.Requires demonstrated broad Electrical equipment and systems experience (HV/MV/LV electrical systems design, transformers, switchgears, Generators, Power Management Systems (PMS), Electrical Integrated Controls System (ELICS), and large Motors (10MW+) and large Variable Frequency Drives, Electrical Process Heaters, Electrical Heat Trace, AC and DC UPS, Cathodic Protection, Emergency Generation and Distribution System, Lighting and Small Power distribution and familiarity with relevant manufacturing processes and relevant industry codes.Experience with large Variable Frequency Drives would be desirable.High voltage and large-scale onshore power design requirements.Brownfield engineering and execution knowledge an advantage.Excellent written and oral English skills.Strong technical and discipline management skills.Good organizational, planning, and coordination skills.Good communication, influencing, and interface skills.Proficient in Microsoft Office suite of software programs, etc.```#J-18808-Ljbffr
Attention! You will be redirected to another site